Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) PowerPack & Stinger-Plus systems (connects to pump wire) User Manual

Page 12

Advertising
background image

TURBOCHARGER INSTALLATION

23.

Note: Some turbos are mounted

with four studs protruding from the

exhaust manifold while others have

two studs in the manifold and two in

the factory turbine housing.
Use the supplied

3

8

-24 x 1

3

4

” bolts

and crimplock nuts for the upper holes

on the turbine mounting flange.
Install the new turbine inlet gasket

provided and apply a dab of anti-seize

compound to the four turbo mounting

studs. Install the turbocharger on the

exhaust manifold. As the turbocharger

is reinstalled, slip the oil drain tube

into the drain hose. Tighten the

turbocharger mounting nuts to 24 ft-

lbs. Tighten the oil drain hose clamp.
Note: Before slipping any boost tubes

and the corresponding hoses, into

position, ensure that all connection

ends are clean and free of any oil

residue and contaminates. Clean

compressor outlet and all connection

points with a non-oil based solvent

such as Acetone, Mineral Spirits,

Denatured Alcohol or Lacquer Thinner.

Read and follow the manufactures

operation instruction for non-oil based

solvent cleaner.

24.

Align the compressor outlet with

the intercooler hose adapter and

tighten the clamp. Tighten the turbine

housing clamp plate bolts to 100 in-

lbs.

25.

Spin the turbocharger shaft

to make sure it turns freely. If not,

loosen the turbine clamp plate bolts

and check for misalignment between

the turbine housing and turbocharger

center section. Retighten bolts and

check again.

26.

Reconnect and tighten the turbo

oil supply hose.

EXHAUST INSTALLATION

27.

Position the new Banks Monster

T.O.P. turbine outlet pipe onto the

turbine outlet elbow. See Figure 3

on page 6-7. Install the attaching bolts

to hold it in place, but do not tighten

them yet.

28.

Place a 4” muffler clamp onto the

outlet of the turbine outlet pipe, and

then slide the intermediate pipe into

the hanger at the transmission mount,

and onto the turbine outlet pipe. Note:

on extended cab short bed models,

it maybe necessary to shorten the

intermediate pipe. Install the muffler

and tailpipe without clamps and

determine how much to trim based on

the hanger position.

29.

On extended cab/quad-cab long

bed models only, position another

4” clamp onto the outlet end of the

intermediate pipe, and install the

extension pipe onto the intermediate

pipe.

30.

Install the muffler assembly

onto the end of the extension or

intermediate pipe. Temporarily support

the muffler and install the hanger

clamp at the front of the muffler. Snug

the nuts, but do not fully tighten them.

31.

At the rear of the muffler, slip

a 4” clamp over the outlet of the

muffler. Install the tailpipe up over

the axle, and into the muffler outlet.

Place the hanger pins into the rubber

frame mounts behind the axle. Slip

the 5” Monster tailpipe tip on. Keep

the wrapping on until installation is

complete. The tip should be rotated so

the clamp nut is pointing down. Install

the 5” tip so that it hangs past the

end of the tailpipe by 1” for fleet-side

trucks and 2

1

2

” for duallies or where

aesthetically pleasing.

32.

Starting from the front of the

vehicle, tighten all exhaust system

attaching bolts and clamps. Make

12

96397 v.8.0

Advertising