Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1204 User Manual
Page 16

11
PNEG-1204 Enclosed Belt Conveyors
Conveyor Assembly
INTERMEDIATE SECTION
INSTALLATION (CONT.)
1. Intermediate Sections bolt together along the
side and bottom flanges. The covers are
fastened to the cover channels by flat clips
and easy grip handles.
2. Standard intermediate sections do not have
a direction in which they bolt to other
intermediate sections. The cover channels
connect intermediate sections on both ends.
3. Two inspection intermediate sections are
included on each installation. They should be
assembled at the head and tail. The
inspection holes should be oriented closest
to the head or tail.
4. The inspection door end of each
intermediate section has adapter angles
with slotted holes for bolting to head or
tail sections.
5. A special cover channel is provided with the
tail as shown at right.
Cover Channel
Cover
Easy Grip
Handles
Tail Section
Intermediate
Inspection
Section
Inspection
Door
Tail Cover Channel
Adapter
Angle
with
Slotted
Holes
Flat
Clips