PNEG-1204 Enclosed Belt Conveyors

Belting Assembly

Squareness of the Conveyor

1. Before tracking procedure is begun, each

section should be square and straight so
there is no unequal weight distribution. Check
conveyor intermediate sections for any
extensive damage such as cave-in sides,
etc. Idlers should be checked for looseness. If
idlers are loose, re-center and tighten set
screws on bearing lock collar.

2. After intermediate sections are bolted

together, a chalk line should be strung along
the sides of the conveyor, making sure that it
is in a straight line. Loosening bolts on the
intermediate frames will permit slight
adjustment of the intermediate sections.

3. After conveyor has been installed, check to

see if the unit is level (width wise). The
conveyor must be level for proper belt
tracking.

BELT TRACKING

Bearing
Adjustment
Bolts

Shims

Shims

TAIL SECTION

HEAD SECTION

Bearing

Bearing