3 initial commissioning – Xylem WQL-pH pH DATALOGGERS User Manual

Page 23

Advertising
background image

WQL-pH

Commissioning

97

ba75821e01

10/2009

3.3

Initial commissioning

1

Start the WQL-Log program (the relevant icon is on the desktop).
The Login window appears.

2

If the WQL-pH logger is connected to the PC via a USB cable and
should communicate with the WQL-Log PC program:
Confirm with OK. The WQL-Log program searches for the connection
with the logger.

3

Confirm with OK.
During the initial commissioning, the Select database window
appears.

Advertising