The power system must be mounted in a clean and dry environment.

Consider both the floor loading and the physical space required for a single bay CXPS power system and the
batteries:

Dimensions for one bay (refer to drawing #0250005-06):

»

mm.........2133H x 660W x 482D

»

Inches....84H x 26W x 19D

Avoid areas that may be subjected to hot air exhaust from nearby equipment.

Provide adequate space for safe and proper circulation of installation and maintenance personnel:

»

Top: clearance required for cables

»

Rear: 3ft (1m) during installation; after installation. a bay can be moved closer to a wall provided
~12" clearance is maintained for ventilation

»

Front: 3ft (1m)

»

Sides: Allow ~6in (15cm) additional space ion the live side of the power system for the live battery
return bar at the top of the bay (Figure 15).