3 recommended torque values, 4 cabling layout – Alpha Technologies Cordex CXPS-D 48-2500_5000A User Manual

Page 42

Advertising
background image

-5HY%



7DEOH' ² &DEOHVL]HHTXLYDOHQWV $:*WR0HWULF

&DEOHVL]H VHHQRWHV

DQG

&LUFXODUPLOV

6TXDUHPLOOLPHWHUV

(TXLYDOHQWPHWULFFDEOH

$:*







$:*







$:*







$:*







$:*







$:*







$:*







$:*







$:*







$:*







$:* RU





RU

$:* RU







$:* RU







0&0 RUNFPLO





RU

0&0 RUNFPLO







0&0 RUNFPLO





RU

0&0 RUNFPLO







0&0 RUNFPLO







0&0 RUNFPLO 







0&0 RUNFPLO







t

6.1.3 Recommended Torque Values

Recommended torque values for connection to the power system:

»

Clear hole connections (nut and bolt)

»

PEM studs

»

PEM threaded inserts

»

Thread formed connections (in copper bus bar)

7DEOH( ² 5HFRPPHQGHGWRUTXHYDOXHV



IWOEV



IWOEV



IWOEV

Grade 5 rating is required for these torque values.

6.1.4 Cabling

Layout

The cabling at the time of installation is straightforward.

»

The AC cables for the rectifiers connect to the shelves on both sides, and are brought down from
the top of the frame to the rectifier shelves.

»

The battery cables and the external battery return bar connect to the bay at the top rear.

»

The load cables to the distribution modules enter the bay through the top.

»

The load return cables connect to external battery return bar

»

All signaling wires (for example, alarms from the CXC Controller) interfacing with the outside world
exit the frame through the top.

Advertising
This manual is related to the following products: