-5HY%

)LJXUH ² ,QWHUED\EXVZRUN

Install inter-bay bus bars top to bottom

Two people are required to perform this procedure.

%HDZDUHWKHUHLVDFRSSHUSLHFHVDQGZLFKHGEHWZHHQWKHYHUWLFDOEXVEDUVDQGKHOGLQ
SODFHZLWKWKHVDPHEROWV\RXDUHDERXWWRUHPRYH

127(

1. Start with the top -48V bar in the primary bay.

2. Remove 2 bolts.

3. Remove the metal sandwiched between the two vertical bus bars along with the last 2 bolts.

4. Repeat the preceding steps on the extension bay.

5. Place the inter-bay bus bar so the bolt holes line up with the bolt holes in the vertical bus bars.

6. Replace the 8 bolts and 2 metal sandwich pieces.

7. Once assembled, torque all bolts to 360 in/lbs.

8. Repeat the procedure for the remaining three inter-bay buses, continuing from top to bottom. Figure 20

shows the completed bus work.

9. If this is a multi-bay installation or if it was necessary to loosen the floor anchors, proceed with final setting of

floor anchors.