5. Installation

The power system must be mounted in a clean and dry environment. Provide sufficient free space at the front
and rear of the power system to meet the cooling requirements of the rectifiers in the power system and to allow
easy access to the power system components.

5.1 Floor drilling for standard anchoring

The anchoring kit and procedures in this section are for a sesimic installation, but apply equally well to a non-
seismic installation.

5.1.1 Drilling the holes for the anchor bolts

)LJXUH ² 0RXQWLQJKROHV WZRIUDPHV\VWHPVKRZQ

/RFDWHEROWVLQ
VORWVDVVKRZQIRU
JUHDWHVWVWDELOLW\

1. If you are installing more than one bay,

snap a chalk line on the floor to align the
bays for mounting.

2. Use a rebar locator to plan for the anchor

positions.

3. Refer to Figure 17 (drawing 0300047-06)

to mark the four anchor hole positions for
standard anchoring or eight anchor hole
positions for seismic anchoring.

Figure 16 shows the preferred location for
the anchor holes within the slots.