Figure 5-29, Figure 5-28 – Atec Tektronix-1502 User Manual

Page 72

Advertising
background image

TM 9-4935-601-14-3&P

3. Do not install Main Circuit Board holding screws at this point.

24. Install cam switch Inserts (see Fig. 5-28)

a. INSERT, SHAFT SEAL (2 ea.) MPL Item 2-155.
b. PACKING (O-ring, 2 ea.) MPL Item 2-116.
c. Procedure

1. Apply G-661 lubricant to o-ring and install as shown in Fig. 5-28.
2. Form a bead of No. 3144 sealant around the fillet area of the insert.
3. Install the two inserts in the Front Panel. Tighten until snug, then back off 2

°

to 3°. Remove any

excess sealant.

25. Finish installation procedure for Main Circuit Board Assembly

a. Procedure

1. Install washer and nut on BNC connector. Tighten nut to a torque reading of 20

±

3 inch-pounds.

2. Install Main Circuit Board holding screws.

26. Install Power Switch Shaft Into Front Panel (see Fig. 5-29)

a. EXTENSION-SHAFT MPL Item 2-14.
b. BUSHING MPL Item 2-15.
c. Procedure

1. Insert the bushing into the Power Switch Seal that was previously installed in the Front Panel.
2. Apply G-661 lubricant to the detent area of the Power Switch Shaft.
3. Install as shown in Fig. 5-29.

27. Installation of the POSITION knob and the FINE POSITION knob (see Figs. 5-30 and 5-31)

a. KNOB, POSITION MPL Item 2-4.
b. KNOB, FINE POSITION MPL Item 2-2.
c. Procedure

1. Apply G-661 lubricant to the POSITION knob as shown in Fig. 5-30.

Figure 5-28. Lubrication of the O-rings and sealing

for the cam switches

Figure 5-29. Installation of the POWER SWITCH.

5-16