J&M GC-31T Assembly User Manual

Page 23

Advertising
background image

GC31

t

-1 G

rain

C

art

a

ssembly

-23-

STEP - 44

STEP - 43

Using an overhead hoist,

lift the bottom tube assem-

bly into the front left corner

of the grain cart. Lower

the bottom tube assembly

until the two corners that

are circled in the figure to

the right to go below the

tank assembly. Then raise

the lower auger back up so

that the two circled corners

can be bolted to the tank.

Attach using (25) M10 x

25 MM serrated hex head

bolts and (25) M10 serrated

hex nuts. Use a drift pin as

needed to help line up the

holes accordingly.

Using an overhead hoist, lift the bottom tube assembly using the lifting hook hole. This should help

set the appropriate angle for laying the assembly into the tank.

Advertising