J&M GC-31T Assembly User Manual

Page 7

Advertising
background image

GC31

t

-1 G

rain

C

art

a

ssembly

-7-

STEP - 11

STEP - 12

Measure from corner to corner on the rails. Reposition the front leg to get the measurements to be

within 1/8” - 1-4” (3mm-6mm) of each other. Once completed, tighten all bolts to ensure that the

structure remains square. (do not tighten bolts on the front leg.)

Attach front rail cross brace. Use (29) M10 serrated flange hex head bolts and (29) M10 serrated hex

flange nuts.

M

easure

-

Advertising