Gc31 – J&M GC-31T Assembly User Manual

Page 48

Advertising
background image

GC31

t

-1 G

rain

C

art

a

ssembly

-48-

STEP - 2

STEP - 91

Feed the Weigh Bar wire through

the left side of the A-frame, exit-

ing out the grommet hole directly

behind the front leg weldment.

Use 3/4” x 3” Gr 5 bolts to attach

the Weigh Bar Weldment to the

A-frame.

Carefully slide the Weigh Bar

into the Weigh Bar Weldment

and attach it with 1” x 4 1/2” Gr 5

Bolt and locknut. Do not damage

Weigh Bar wire.

Attach Swivel Hitch with 1” x 5

1/2” Gr 5 Bolt and locknut to the

Weigh Bar.

3/4” x 3” Grd 8 Bolt

Weigh Bar

Weigh Bar Weldment

Swivel Hitch

1”x 4 1/2” Grd 5 Bolt

Feed wires from the right side weigh bars as

shown, through adapter plate then through the

frame.

Feed wires from left side weigh bars as shown,

through adapter plate, frame, then through the

cross bar on the frame (as shown in diagram to

the left).

Now all five wires should be ran to the left hole

above the center cross brace in the A- frame.

Junction Box

Indicator Wire

Right Weigh Bars

Left Weigh Bars

Hitch Weigh Bar

In the Junction Box are 7 connectors. The

connector that is on the left side of the Junc-

tion Box needs to be plugged. To install, loos-

en the connector, insert plug, then retighten.

Run indicator wire from back of the indicator

to the front center connector of the junction

box.

Run all five weigh bar wires to the Junction

-Box.

*See image on next page.

-Scale Option-

1” Locknut

*Right & Left determined by facing the rear of cart.

Note: Run wire from

weigh bar through left

side of frame as shown

1” x 6” Grd 5 Bolt

Advertising