J&M GC-31T Assembly User Manual

Page 50

Advertising
background image

GC31

t

-1 G

rain

C

art

a

ssembly

-50-

STEP - 94

STEP - 93

STEP - 92

Attach two 1/4” x 29” (736.6mm)

hydraulic hoses from the shut off gate

cylinder to the tank bulkhead couplings.

Attach two 1/4” x 160” (4,064mm)

hydraulic hoses from the tank bulkhead

couplings to the tractor..

Install the 1/4” x 206” hose to the bottom

(closest) end of cylinder. Install the 1/4” x

222” hose to the top (farthest) end of cylinder.

Advertising