Rigging and lifting procedures – ClimaCool UCR 30, 50 and 70 tons Manual User Manual
Page 11
                                    Advertising
                                    
                                        
                                    
                                
                                 
11
www.climacoolcorp.com
Rigging and Lifting Procedures
Rigging (Figures 1 and 2)
Each module should be lifted by using lift straps threaded through the steel base cut outs and the use of a spreader bar.
Lifting and Transporting Modules (Figure 3)
Pallet jacks or forklifts are required for lifting and transporting the module. Each module has base cutouts provided for ease 
of maneuverability.
Figure 1
Figure 2
                                    Advertising