Water Piping
As with any water system, it is important that the system 
be clean. If care is taken during installation, the possibility 
of dirt related problems are avoided in future operation 
of the chiller. The pipe work installer must remove weld 
scale, rust and contamination during pipe work fabrication. 
The system water piping must be fl ushed thoroughly 
with recommended alkaline fl ush or other chemicals that 
are compatible with 316 stainless steel, prior to making 
connections to the ClimaCool chiller. There are certain 
necessary components that should always be installed 
in the chilled water system. (See Figures 1 and 2 on page 
15 - Water Piping Confi gurations). Piping confi gurations on 
multiple modules may also be found on page 15 - Water 
Piping Confi gurations. All water piping must be installed in 
accordance with applicable codes and standards. 
 
Temperature Sensor and Wells
ClimaCool provides (2) temperature sensors and wells with 
each chiller system programmed by the Master Control 
Panel. They must be fi eld installed, 60 inches away from the 
bank, on the chilled water inlet and chilled water outlet (See 
Water Piping Confi gurations – page 15). 
Pressure Diff erential Flow Switch
It is imperative that minimum and maximum water fl ow 
rates, as defi ned in the Physical Data tables on page 8, 
are not exceeded. To prevent the operation of the chiller 
without suffi
cient water fl ow to the evaporator it is a
required safety device to install a pressure diff erential 
fl ow switch in the chilled water circuit, downstream of the 
strainer (See Water Piping Confi gurations – page 15). 
Pressure Taps
The installing contractor must provide access ports for 
connecting the pressure diff erential fl ow switch and 
pressure gauges for the chilled water system. A 1/4” 
pressure tap is required on the inlet and the outlet of the 
chilled water system for a total of four taps. If a port is 
shared by the pressure diff erential fl ow switch and the 
pressure gauge it will require two 1/2” taps. (See Water 
Piping Confi gurations – page 15).
Water Isolation Valves
It is recommended to provide bank water isolation valves for 
proper isolation and maintenance of the chiller, pump and 
strainer (See Water Piping Confi gurations – page 15).
Strainers – Minimum 60 Mesh Screen Required
ClimaCool chillers employ brazed plate heat exchangers 
which are extremely sensitive to debris. Therefore, it is 
mandatory that all chilled water systems include a strainer 
with a minimum of 60 mesh screen for proper fi ltration. The 
strainers must be installed as shown in the Water Piping 
Confi gurations on page 15.
ClimaCool’s warranty does not cover and does not apply to 
products which have defects or damages due to freezing 
of the water supply, an inadequate or interrupted water 
supply, corrosives or abrasives in the water supply, or 
improper or inadequate fi ltration or treatment of the 
water supply.