into the groove of either pipe end. Place the coupling halves 
over the gasket and make sure that the coupling keys, 
the part that goes into the groove, are engaged into the 
grooves. Insert the bolts and install nuts to hand tight. Make 
sure that the oval neck of the bolt engages into the bolt 
hole of the housing. Tighten nuts alternately and equally 
until the bolt pads meet and make metal to metal contact. 
Tighten nuts by another 1/4 to 1/2 turn to make sure the nuts 
and bolts are snug and secure, the use of a torque wrench 
is usually not required. Be aware that uneven tightening 
of bolts may cause the gasket to be pinched resulting in 
immediate or delayed leaks. 
Optional Sound Attenuation Panels and Gasket
Attenuation panels are fi eld installed enclosures made of 
18 gauge galvanized steel with powder coat paint fi nish 
and fi berglass insulation. Panel package includes (4) bank 
end panels and (4) panels for each module in the bank 
and gasket sealant tape for installation between modules. 
Install the 1” x 1” gasket sealant tape on the outer frame 
on the side of one module prior to installing the adjacent 
modules. Install panels by setting in place and locking 
down with the half turn latches. Bank end panels must be in 
place prior to attaching the building system water piping. 
Header Insulation
Chilled water piping is pre-insulated on each module at 
the factory with 3/4” closed cell insulation. After bolting 
all modules together and leak testing, the entire coupling 
connection will need to be insulated by the installing 
contractor.
Optional Sound Attenuation Panels and Gasket
Attenuation panels are fi eld installed enclosures made of 
18 gauge galvanized steel with powder coat paint fi nish 
and fi berglass insulation. Panel package includes (4) bank 
end panels and (4) panels for each module in the bank 
and gasket sealant tape for installation between modules. 
Install the 1” x 1” gasket sealant tape on the outer frame 
on the side of one module prior to installing the adjacent 
modules. Install panels by setting in place and locking down 
with the half turn latches. Bank end panels must be in place 
prior to attaching the building system water piping.