FlexLink XT (макс. 30 кг) Монтаж User Manual
Page 61
Advertising

5113235 61
3 Loosen the screws (2×M8) that connect the drive
unit to the transfer unit. Use the 5 mm Allen key.
4 Put the drive unit on top of the beams of the main
conveyor next to the position where you are to
mount the transfer unit.
5 Fit the transfer unit to the conveyor beams. Use
the 10 mm box wrench.
6 Fit the drive unit back into the transfer unit. Make
sure that the motor cable is put in a safe position,
e.g. not directly under the adjusting screw or too
close to the cylinder. Attach the screws, 2×M8.
Use the 5 mm Allen key.
7 Attach the top cover plate. Use the 3 mm Allen
key.
Advertising