iMonitor Settings

OEE Availability = Operating Time / Planned Production Time

Planned Production Line settings

If no schedule is set the default scheduled time will be 24/7.

Once a schedule has been set up a schedule will always be required.

Operating Time

The operating time calculation can be configured by selecting a machine state.

- Will include in the OEE Operating Time calculation.

- Will excluded in the OEE Operating Time calculation.

Performance = (Total Pieces * Ideal Cycle Time) / Available Time

Ideal Cycle time settings

The ideal cycle time calculation can be configured by inputting the expected units per hour
value per process point.