27 AUG 08

PRELIMINARY MANUAL

37 of 57

Rev 1_3

Commander LI90 Series

• Relays #3 and #4 will ask for a Differential ON and Differential OFF level.

These settings must be in the same units used for the Empty and Full settings.


Differential ON

Differential OFF

• This allows the end use to select a differential level between the two

analog inputs

• Channel #1 must be the upstream level and Channel #2 the

downstream level

• Typically, Relay #3 is used for the main differential control and Relay

#4 is for an alarm differential

• Use the Next soft key to advance to the next setting

• Use the Back soft key to return to the previous setting
• When done, press Exit to leave the Secured Function Section