GATE OPERATOR INSTALLATION

Concrete Pad Option

1. Follow the local building code to determine the required depth of the con-

crete pad.

2. Pad measurements recommended by Viking Access Systems are at lease

24” long, 18” wide and 24” deep to ensure the stable operation of the op-
erator, and a minimum of 4” above level grade to avoid any flooding of the
machinery.

3. Provide a sufficient number of conduit pathways for all low power acces-

sories such as loop detector leads, maglock, non-contact sensors, contact
sensors, safety and other commands. Also provide conduit for the power
supply to the operator.

!

DO NOT run low voltage and high voltage wiring in the same conduit.

!

Provide at least 12” separation between low and high voltage conduits.