Gate operator installation, Post mounting option tip – Controlled Products Systems Group H10NX User Manual

Page 17

Advertising
background image

VIKING TECHNICAL SUPPORT 1.800.908.0884

1 5

Post Mounting Option

TIP:

The operator is equipped for post mount applications and is

ready for installation.

You will only need to supply the posts and u-bolts.

1. Consult the local building codes for the depth and concrete requirements.

2. Maximum 3.00” OD pipe.

3. Provide a sufficient number of conduit pathways for all low power acces-

sories such as loop detector leads, maglock, non-contact sensors, contact
sensors, safety and other commands. Also provide conduit for the power
supply to the operator.

!

DO NOT run low voltage and high voltage wiring in the same conduit.

!

Provide at least 12” separation between low and high voltage conduits.

GATE OPERATOR INSTALLATION

Advertising