Rma-303 indirect charge - installation – Ransburg RMA Indirect A12869 User Manual

Page 39

Advertising
background image

RMA-303 Indirect Charge - Installation

LN-9268-11.4

34

FLUID TUBING CONNECTION REQUIREMENTS

Fixed Atomizer

Pressure (Maximum)

Paint Line (P)

6mm ID / PFA

200 psi max. (1379 kPa)

Cup Wash Solvent Line
(SOL)

A11283-00 Nylon Recircula-
tion Tube-In-Tube

150 psi max. (1033 kPa)

Dump Line (DL)

7mm ID / Nylon

200 psi max. (1379 kPa)

MOUNTING

The RMA-303 is equipped with a quick discon-
nect assembly. The quick disconnect feature
consists of a robot plate which is permanently
attached to the robot through a wrist adapter
plate, and a mating bell plate which is a part of
the RMA-303 atomizer assembly. The atomiz-
er is secured to the robot plate with a threaded
retaining ring.

ELECTRICAL AND FIBER OPTIC
CONNECTIONS

The fiber optic connection is made on the back
of the atomizer's robot plate. The fiber optic
cable comes preassembled with connectors
that are secured in place by set screws tight-
ened from the side of the robot plate. An ade-
quate ground must be provided to the mount-
ing plate to ensure that fluid fittings, etc. are at
ground potential.

Maximum amount of splices for any length of
cable is 3. The speed detection signal may be
affected if splices are exceeded. Length in
any combination for the fiber optic is 100-feet.

FLUID CONNECTIONS

The paint, solvent, and dump fluid tubing are con-
nected on the back of the robot plate with stainless
steel compression fittings and PFA tubing. Fluid
tubing requirements are shown in "Fluid Tubing
Connection Requirements" below.

TYPICAL INSTALLATION

Figure 3 shows a Typical Installation of the RMA-
303 and the wiring installation of the applicator with
the MicroPak.

AIR HEATER

Connect air heater to turbine air tubing. Air heater
connection to bearing air is not required.

Advertising