5 checking after installation, 4 checking after installation, Warning 4.5 – IAI America IX-INN8040 User Manual

Page 29

Advertising
background image

23

4. How to Install

4.4

Checking after Installation

Once the robot has been installed, check the following items:

Visually check the robot, controller and cables for dents and other abnormalities.

Confirm that the cables are connected properly and that the connectors are inserted securely.

Failure to perform these checks may result in a malfunctioning robot or a damaged controller or

robot.

Warning

4.5

Advertising