ZOLL Thermogard XP IVTM System Operation Manual User Manual
Page 66
Advertising
Operation
35
The Alsius Start-up Kit
6.
Open the System Start-up Kit. For convenience and sterility, all items in
the kit are preconnected.
Figure 4-38. System Start-up Kit.
7.
Insert the heat exchanger coil into the coolant well.
Figure 4-39. Installing the Heat Exchanger Coil.
8.
Temporarily slide the air trap into the holder.
600479-001 Rev 2 66/147
Advertising