ZOLL Thermogard XP IVTM System Operation Manual User Manual
Page 69
Advertising
Operation
38
Figure 4-43. Pump Tubing Installation.
13.
Close the top cover on the pump. It will snap shut.
Cover the Coldwell
14.
Replace the cap on the coolant well. Position the cap so that the heat
exchanger coil and tubing fits into the notch. Press down on the cap to
create a tight seal.
Figure 4-44. Replace the Cap on the Coolant Well.
Spike the Saline Bag
15.
Using aseptic technique, connect the priming line to the sterile saline
container. The priming line is equipped with a “spike” connector. Hang
the saline container on the hook provided.
600479-001 Rev 2 69/147
Advertising