Nexo GEO D User Manual

Page 38

Advertising
background image

Page 38/97

GEO

D

RIGGING PROCEDURE

IMPORTANT

DO NOT attempt to make any changes to the angle adjustements when the compression

pull-up force is applied.

5.4.7 Positioning the cluster

• Adjust the bumper angle as determined in GeoSoft2 by rotating the lever from the bottom of the

cluster ;

• Check all GEO D angles with an inclinometer;
• Lift the GEO D array to the height determined in GeoSoft2 (GeoSoft2 array height definition is for

the top edge of the topmost cabinet);

• Once the bumper is in definitive position a secondary safety steel must be fitted (this secondary

safety steel should link the bumper to a suitable point in the supporting structure);

IMPORTANT

The requirements for secondary safety systems vary with territories. However, the
secondary safety steel MUST have a SWL equivalent to or greater than that of the rigging
system.

APPLYING COMPRESSION AND SETTING BUMPER ANGLE

Advertising