RIGGING PROCEDURE

Page

39/97

5.4.8 De-rigging and loading out

Taking the system down is just a case of doing the reverse procedure to flying the array. However,
there are some important factors to consider.

• Lower the array until the bottom cabinet is just off the floor;
• Rotate the chain hoist lever counter-clockwise until bumper is back to horizontal position and no

tension is applied on the GEO D compression chain.

• Disconnect the bottom GEO D from the bottom bumper and remove the bottom bumper from the

array.

Link cables must be disconnected and stowed away in the recesses in the rear of each

cabinet.

• NB : As the system is lowered it is good practise to disconnect as many loudspeaker cables as

can be reached without climbing the array. This ensures that a cable should not be accidentally
forgotten when the system is separated. Damage to the connector will occur should this mistake
be made.

• Angle adjustment push-pins should be removed from the angle setting and inserted in the “FIX”

hole so that Geo D’s sit flat on the dolly.

• Lift the dolly manually below the array and connect it to the bottom GEO D with 4 push-pins.

Carefully lower the array so that the dolly being on the ground is not being submitted to
the entire cluster weight.

• Disconnect the first block of 3 GEO D’s at the connection between 3

rd

and 4

th

bottom cabinets.

• Carefully lift the array until the array is clear. Ensure the array is vertical at all times.
• Repeat the procedure for all cabinets.
• Remove the GEO D compression chain from the GEO D extension bar, slide the extension bar

into the bumper and remember to replace all the axes back in their respective beams.