3 first to second geo sub – Nexo GEO D User Manual

Page 51

Advertising
background image

GEO

D

RIGGING PROCEDURE

Page

51/97

4 push-pins (BLGEOD, 10mm diameter x 20 mm length) connect the top GEO SUB to the bumper.

• Position the bumper on the first GEO SUB by lifting or lowering bumper assembly with motor

hoists;

• Link the GEO SUB to the bumper assembly using the four 10mm x 20mm push-pins; front

bumper connects at GEO SUB front articulation point, rear bumper connects at “LIFT” GEO SUB
rigging plates holes;

• Check that all push-pins are in their locked position.
• Ensure that no objects have been placed accidentally on the top of the bumper as they may fall

when the system is lifted.

"LIFT" POINT

"LIFT" POINT

"LIFT" POINT

"LIFT" POINT

FIRST GEO SUB TO BUMPER ASSEMBLY

“LEFT“

CONFIGURATION

“RIGHT“

CONFIGURATION

5.6.3 First to second GEO SUB

4 push-pins (BLGEOD, 10mm diameter x 20 mm length) connect first to second GEO SUB, 2 additional
push pins-are required for angle adjustment.

FIRST TO SECOND GEO SUB

Advertising