Nexo GEO D User Manual

Page 63

Advertising
background image

GEO

D

RIGGING PROCEDURE

Page

63/97

5.7.5 Applying compression with the Chain Lever Hoist

• Once the GEO SUB assembly is completed, connect the second GEO D Main Bumper below

the last GEO SUB with the 10mm x 20mm push-pins inserted in the “FIX” bottom hole (see
drawings below).

• Connect the Bottom Extension Bar EX3 to the Main Bumper through the Link Points with the two

axes using corresponding holes (see drawing below), and ensure that these axes are properly
locked with supplied “R” clips;

• Check the array according to the Checklist procedure described later in this manual.
• Attach the main hook of the Chain Lever Hoist to the rear of the Bottom Extension Bar EX3;

LINK POINT

COMPRESSION
POINT

LINK POINT

Advertising