Jenway 73 Series PC software User Manual

Page 56

Advertising
background image

56

7.1.8

Setting lag time or start on level

In this measurement mode it is

possible

to

delay

the

commencement of the kinetics

measurements by setting a lag

time or a start on level. The lag

time is the amount of time that the

instrument will wait before starting

the kinetics measurements. The

start on level is the absorbance

level that must be reached before

commencing

the

kinetics

measurements.

To select a lag time type the

required time in seconds in the text

box. Only numeric values up to

999 seconds can be entered.

To select a start on level put a tick

the box adjacent to the Start On

Level. Type the start absorbance

or % transmittance value into the

text box. Click on the arrow on the

drop down box to select between

starting above or below this value.

Advertising