Installation for flow measurement – KROHNE OPTISONIC 6300 P-6400 EN User Manual
Page 14

3
INSTALLATION FOR FLOW MEASUREMENT
14
OPTISONIC 6300 P
www.krohne.com
03/2013 - 4000972603 - MA OPTISONIC 6300 P R03 en
Long horizontal pipes
• Install on slightly ascending pipe section.
• If not possible, make sure that the flow velocity is high enough to prevent air, gas or vapor to
collect in upper part.
• In partially filled pipes, the clamp-on flowmeter will report incorrect flow rates, or not
measure.
Vertical pipelines
CAUTION!
Make sure that the rail is not mounted at the highest point (risk for air bubbles) or at the lowest
point (risk for particles) of the pipe.
Figure 3-2: Long horizontal pipes
CAUTION!
Make sure that the pipe is fully filled at all times.
INFORMATION!
Both ascending and descending flow directions are measurable.
Figure 3-3: Mounting on vertical pipelines is possible