Installation for flow measurement, 2 2 traverses with 2 rails – KROHNE OPTISONIC 6300 P-6400 EN User Manual
Page 27

INSTALLATION FOR FLOW MEASUREMENT
3
27
OPTISONIC 6300 P
www.krohne.com
03/2013 - 4000972603 - MA OPTISONIC 6300 P R03 en
3.4.2 2 traverses with 2 rails
Applicable diameters with two rails:
• Mount the first rail on the pipe. Make sure that you mount the rail in line with the pipe!
• Position the left transducer in any position X (see next section).
• Mount the second rail (align it with the first rail) at a distance 2 to arrange that the transducer
in the second rail is within the range it can be moved.
• The advised distance 1 is defined from the center
center
center
center of the left transducer to the left
left
left
left side of the
right transducer. Put the second transducer at position Z = advised distance 1 + X - distance
2 - 415 mm / 16.3".
Number of
traverses
Diameter range
2
DN200...750
INFORMATION!
The two rails must be installed in a straight line.
Figure 3-12: Mounting 2 rails in V-mode (2 traverses)
1 Advised distance
2 Distance between 2 rails