Installation for flow measurement, 4 step 3: mount the sensor rails – KROHNE OPTISONIC 6300 P-6400 EN User Manual
Page 23

INSTALLATION FOR FLOW MEASUREMENT
3
23
OPTISONIC 6300 P
www.krohne.com
03/2013 - 4000972603 - MA OPTISONIC 6300 P R03 en
• Press Next to go to the next menu:
3.4 Step 3: Mount the sensor rails
Before mounting the rails, determine the colors on the connectors of the transducers. Make
sure that the blue transducer is upstream and the green transducer is downstream.
Installation with metal straps (DN15...250)
Put the metal straps around the pipe. Put the sensor rail(s) on the pipe including the transducers
with fixed cables.
1.8
Advised sensor position
34.30 mm
Signal quality
0%
< Previous | Next >
< Previous | Next >
< Previous | Next >
< Previous | Next >
13-04-2010 14:11:09 13 MB free
Advised distance [mm]
Number of rails needed
< 190
1
≥ 190
2
INFORMATION!
The maximum distance that can be covered with 1 rail is 195 mm.
The minimum distance for two rails is 180 mm.
INFORMATION!
On request it is possible to use the large rail of the OPTISONIC 6300 with
0,5 MHz transducers. Using this you can measure up to DN4000.