Power distribution – HP Array Controller HSG V8.7 Software User Manual

Page 145

Advertising
background image

Power Distribution

UltraSCSI RAID Enclosure 6–19

3.

Align the ac input box (C

ALLOUT

1) with either slot A or slot B in the

lower left or lower right corner of the RAID enclosure, respectively.

4.

Push in on the ac input box to fully seat it.

5.

Tighten the two retaining screws (C

ALLOUT

2).

6.

Connect the ac power cord (C

ALLOUT

4) from the ac power source to

the ac input box (C

ALLOUT

1).

7.

If necessary, repeat steps 1 through 6 to install a second ac input box.

8.

Turn O

N

each ac input box

by pressing the I on the ac
power switch (C

ALLOUT

1).

9.

Verify that all power supply status LEDs turn O

N

.

Table 6–6

Installing an AC Input Box (Continued)