Power verification and addressing – HP Array Controller HSG V8.7 Software User Manual

Page 99

Advertising
background image

Power Verification and Addressing

UltraSCSI RAID Enclosure 4–13

2.

If there are no expansion enclosures, go to step 3.

If there are expansion enclosures, press and hold the PVA standby
power switch (C

ALLOUT

1) on an expansion enclosure until the

master EMU initiates a power shut down on all enclosures.

3.

Press and hold the PVA standby power switch (C

ALLOUT

1) on the

master enclosure until the master EMU initiates a power shut down
on the master enclosure.

4.

Turn O

FF

all the ac input

boxes by pressing O on each
ac power switch
(C

ALLOUT

1) on any

expansion enclosure and
then the master enclosure.

Table 4–6

Removing a PVA (Continued)

CXO6303A

1

1

0

CXO5488B

2

1

Advertising