Applying power, Figure 2–2 ac power distribution, Applying power –6 – HP Array Controller HSG V8.7 Software User Manual

Page 42: Figure 2–2 a, Operating the ultrascsi enclosure

Advertising
background image

Operating the UltraSCSI Enclosure

2–6 UltraSCSI RAID Enclosure

Applying Power

Initial power application is a matter of turning on the ac input boxes
located in the lower left and right corners of the enclosure (see Figure
2–2
, labels A and B). Pressing the I on the ac power switch applies ac
power only to the shelf power supplies on the associated power bus
(bus A or B).

Note

Apply power in the following sequence:

1.

All expansion enclosures

2.

Master enclosure

Figure 2–2

AC Power Distribution

AC Input Box

AC Input Box and SBB Shelf

Power Supply Locations

Figure C

ALLOUTS

1.

Power bus A

2.

Power bus B

1

0

CXO5113A

17

11

CXO5808B

19 20

21 22 23 24

13 14

15 16

18

7

8

9

10

12

1

2

3

4

5

6

A

B

4A

3A

2A

1A

3B

2B

1B

4B

5A

Shelf 4

Shelf 3

Shelf 2

Shelf 1

1

2

Advertising