HP XP P9500 Storage User Manual

Page 33

Advertising
background image

Priority set for initial copy operations and scheduling order

For performing more initial copy operations than the setting value of the Maximum Initial Copy
Activities set on the System Option dialog box, the scheduling order (Priority) can be set for the
initial copy operations to be performed. This section explains the assignment of the scheduling
order of initial copy operations in cases where two sets of multiple initial copy operations are
performed.

An example is described in which 4 Cnt Ac-S Z pairs are created at the same time in cases where
the setting value of the Maximum Initial Copy Activities is 2. The Priority which is set for the M-VOLs
of Cnt Ac-S Z pairs is shown in the following table.

Table 14 Priority set for M-VOLs for which initial copy operation is performed

Value set for Priority

M-VOL

2

LDEV 00

3

LDEV 01

1

LDEV 02

4

LDEV 03

The order of starting initial copy and the Priority which is set for the M-VOLs are shown in the
following table.

Table 15 Relationship between order of starting initial copy and priority set for M-VOLs

Value set for Priority

M-VOL

Order of starting initial copy

1

LDEV 02

1

2

LDEV 00

2

3

LDEV 01

3

4

LDEV 03

4

In this case, as the setting value of the Maximum Initial Copy Activities is 2, initial copy operations
for LDEV 02 and LDEV 00 are started. If either one of the initial copy operations for LDEV 02 and
LDEV 00 is completed, the initial copy for LDEV 01 is started.

The next example explains the assignment of the scheduling order of initial copy operations in
cases where initial copy is already performed and two Cnt Ac-S Z pairs are newly added. The
M-VOLs of the Cnt Ac-S Z pairs to be newly added and the Priority are shown in the following
table.

Table 16 Priority set for M-VOLs of Cnt Ac-S Z pairs to be added

Value set for Priority

M-VOL

2

LDEV 10

1

LDEV 11

If initial copy is already started and if any initial copy is newly added, the additional initial copy
is started after the previously performed initial copy is completed. The priority of all the initial copy
operations being performed is shown in the following table.

Planning volume pairs

33

Advertising