Recovery with business copy z configuration – HP XP P9500 Storage User Manual

Page 113

Advertising
background image

7.

Use Business Continuity Manager to execute the YKMAKE command (a command for creating
a pair) on the Continuous Access Synchronous Z pair.

The system configuration returns to the original 3DC multi target configuration

Recovery with Business Copy Z configuration

If disaster or failure occurs at the primary site where the Business Copy Z secondary volume is
shared with the Continuous Access Journal Z primary volume on the local site, you can continue
business operations using the remote Continuous Access Journal Z secondary volume, and then
restore data and business operations back to the primary site. Proceed as follows using Business
Continuity Manager:
1.

Release the Business Copy Z pair using the YKDELETE command.

2.

Suspend the Continuous Access Journal Z pair using the YKSUSPND REVERSE command.

3.

Reverse the copy direction and re-establish the Continuous Access Journal Z pair using the
YKRESYNC REVERSE command.

4.

Suspend the Continuous Access Journal Z pair using the YKSUSPND FORWARD command.

5.

Reverse the copy direction of the Continuous Access Journal Z pair again to the original
direction and re-establish the pair using the YKRESYNC FORWARD command.

6.

Delete the Continuous Access Journal Z pair using the YKDELETE command.

7.

Reverse the copy direction of the Business Copy Z pair using the YKMAKE command.

8.

Release the Business Copy Z pair using the YKDELETE command.

9.

Reverse the copy direction of the Business Copy Z pair again to the original direction and
re-establish the pair using the YKMAKE command.

10. Suspend the Business Copy Z pair using the YKSUSPND command.
11. Create the Continuous Access Journal Z pair using the YKMAKE command.

Recovery procedures with shared volumes

113

Advertising