Preparing the library for operation, 57 repacking the library – HP EML E-series Tape Libraries User Manual
Page 101
c. Roll the library onto the pallet.
2.
Secure the library:
a. Place the antistatic bag over the library, and secure it into place.
b. Use the four shipping bolts to secure the library to the pallet.
c. Remove the ramps from the pallet and place them in a box.
3.
Place the ramp box and accessory kits onto the pallet.
4.
Place the four corner posts against the rack.
5.
Wrap the cardboard sheets around the library, and fasten using the plastic restraining clips.
6.
Place the top (cap) onto the packed library.
7.
Secure the packed library with two restraining bands.
2
gl01013
6
1
2
2
2
2
3
4
5
6
3
1
Ramps
4
Cap
2
Corner posts
5
Antistatic bag
3
Corrugated sheets
6
Shock pallet
Figure 57 Repacking the library
Preparing the library for operation
After shipping or moving the library, see the Getting Started manual for your library to:
•
Prepare the new installation site.
•
Receive the library.
•
Uncrate the library.
•
Position the library.
•
Remove the robotics unit shipping restraints.
•
Install and configure the library.
Enterprise Modular Library E-Series
101