5 moving the library, Selecting an installation location, Preparing the library for a short move – HP EML E-series Tape Libraries User Manual

Page 99

Advertising
background image

5 Moving the library

This section explains how to move or ship the library. To ship the library, or move it using a motor

vehicle (for example, truck, or forklift), follow the instructions in this section. To move the library to a

new location within the same building or facility, follow all instructions in this section except for those

found in

Repacking the library

” on page 100.

NOTE:

These procedures require the original packaging materials of the library. If you do not have the original

packaging materials, contact your support representative for ordering information.

CAUTION:

Moving or shipping the library without proper packaging materials can result in damage to library

components. HP strongly recommends that an HP authorized service representative move a library to

another location.

Selecting an installation location

When choosing an installation site for the library, consider the requirements in the following sections.

Preparing the library for a short move

1.

Remove all tape cartridges from the tape drives using your application software.

2.

At a minimum, attach the robot shipping straps.

11666

2

1

1

Shipping straps

2

Yellow gear lock

3.

For added protection, also push the yellow gear lock up to prevent movement of the reduction gear.

4.

Roll the library carefully on level surfaces to its destination.

Enterprise Modular Library E-Series

99

Advertising