Figure 5–3 single-battery ecb ssb configuration, Figure 5–4 dual-battery ecb sbb configuration, Replacing the external cache battery storage – HP Array Controller HSG V8.7 Software User Manual

Page 223: Building block –27, Single-battery ecb ssb configuration –27, Dual-battery ecb sbb configuration –27

Advertising
background image

Replacement Procedures

5–27

Replacing the External Cache Battery Storage
Building Block

The ECB SBB can be replaced with cabinet power on or off. A single-
battery ECB SBB is shown in Figure 5–3 and a dual-battery ECB SBB
is shown in Figure 5–4.

Figure 5–3 Single-Battery ECB SSB Configuration

Figure 5–4 Dual-battery ECB SBB Configuration

1

Battery disable switch

2

Status LED

3

ECB Y cable

1

Battery disable switch

2

Status LED

3

ECB Y cable

4

Faceplate and controls for second battery

CXO5715A

CACHE

POWER

STATUS

SHUT OFF

1

3

~

2

CXO5713A

CACHE

POWER

STATUS

SHUT OFF

CACHE

POWER

STATUS

SHUT OFF

3

~

4

2

1

Advertising