Figure 5–3 single-battery ecb ssb configuration, Figure 5–4 dual-battery ecb sbb configuration, Replacing the external cache battery storage – HP Array Controller HSG V8.7 Software User Manual
Page 223: Building block –27, Single-battery ecb ssb configuration –27, Dual-battery ecb sbb configuration –27
Advertising
Replacement Procedures
5–27
Replacing the External Cache Battery Storage
Building Block
The ECB SBB can be replaced with cabinet power on or off. A single-
battery ECB SBB is shown in Figure 5–3 and a dual-battery ECB SBB
is shown in Figure 5–4.
Figure 5–3 Single-Battery ECB SSB Configuration
Figure 5–4 Dual-battery ECB SBB Configuration
1
Battery disable switch
2
Status LED
3
ECB Y cable
1
Battery disable switch
2
Status LED
3
ECB Y cable
4
Faceplate and controls for second battery
CXO5715A
CACHE
POWER
STATUS
SHUT OFF
1
3
~
2
CXO5713A
CACHE
POWER
STATUS
SHUT OFF
CACHE
POWER
STATUS
SHUT OFF
3
~
4
2
1
Advertising