Installation

6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48

hours.

1. Baseplate
2. Grout
3. Foundation
4. Dam
5. Bolt

7. Tighten the foundation bolts.
8. Recheck the alignment.

Piping checklists

General piping checklist

Precautions

CAUTION:

• Never draw piping into place by using force at the flanged connections of the pump. This can

impose dangerous strains on the unit and cause misalignment between the pump and driver. Pipe
strain adversely affects the operation of the pump, which results in physical injury and damage to
the equipment.

• Vary the capacity with the regulating valve in the discharge line. Never throttle the flow from the

suction side. This action can result in decreased performance, unexpected heat generation, and
equipment damage.

CAUTION:

Piping guidelines

Guidelines for piping are given in the Hydraulic Institute Standards available from the Hydraulic
Institute at 9 Sylvan Way, Parsippany, NJ 07054-3802. You must review this document before
you install the pump.

Checklist

Check

Explanation/comment

Checked

Check that all piping is supported This helps to prevent:
independently of, and lined up

• Strain on the pump

naturally with, the pump flange.

• Misalignment between the pump and the drive unit
• Wear on the pump bearings and the coupling
• Wear on the pump bearings, seal, and shafting

Keep the piping as short as pos-

This helps to minimize friction losses.

sible.
Check that only necessary fittings This helps to minimize friction losses.
are used.