Install the knock-off ring

1. Coat the shaft (122) protuberance with an anti-seize compound.
2. Loosen but do not remove the hex head screws holding the knock-off ring assembly (149)

halves together.

3. Position the knock-off ring onto the shaft (122) and make sure that the part is properly

oriented. The side of the knock-off ring that should face the impeller is marked "THIS SIDE
OUT".

4. Slide the knock-off ring towards the bearing cartridge housing until it is flush with the

inboard end cover (119). Be sure to assemble the knock-off ring (149) such that the words
"this side out" can be read from the threaded end of the shaft.

On the XHD model, the knock-off ring will fit over the inboard Inpro seal (332A).

Install the shaft sleeve

1. Prepare the shaft sleeve (126) by coating the shaft sleeve o-ring (412F) and impeller hub o-

ring (412A) with a lubricant and installing the o-rings into the sleeve.

2. Slide the shaft sleeve (126) with the impeller hub o-ring (412A) properly positioned (facing

outward) onto the shaft. Use care positioning the sleeve on the shaft to avoid any o-ring
damage.

3. Continue sliding the sleeve until it is fully seated in the knock-off ring. Use a soft blow mallet

to gently tap the sleeve along the shaft if necessary.

Pump model

Next step to follow

XHD

• You will need to assemble the two split

stuffing box halves before attaching the stuff-
ing box to the seal cover. Start with the next
step, Assemble the split stuffing box.

XHD Value Option

• Go to Install the seal cover instructions.