Goulds Pumps XHD - IOM User Manual

Page 80

Advertising
background image

Maintenance

Locate and lift the volute liner for optional discharge locations (field replacement)

1. Using the ITT approved volute liner and Impeller lifting device, the Volute Liner (561) can

be installed into the Gland Casing (100D) the field in any of the optional discharge
orientations.

2. Remove the Suction casing and Suction Liner assembly as described in the section

'Remove the Suction Side.

3. Remove the Impeller as shown in the impeller removal section.

78

XHD Installation, Operation, and Maintenance Manual

Advertising