Install the gland half casing and seal cover – Goulds Pumps XHD - IOM User Manual
Page 97
Advertising
Maintenance
Install the gland half casing and seal cover
1. Install the tapered alignment studs (375B) into the gland half casing (100D) using a metric
stud driver.
a) Install the seal cover into the casing.
b) With bolts and clipped washers (354A) (388A).
2. Attach the hoist hook to the gland half casing (100D) lifting lug, such that the casing
discharge will be oriented properly for the application.
3. Lift the gland half casing (100D) into position and move forward until it is flush with the
pedestal (131) by guiding the tapered alignment studs through the pedestal flanges.
4. Install the hex nuts (427D) onto the tapered alignment studs (375B).
XHD Installation, Operation, and Maintenance Manual
95
Advertising