Festo Линейные модули HMP User Manual

Page 18

Advertising
background image

HMP−...−KP−...

Festo HMP−...−KP−... 0408b English

18

To install the clamping unit in the linear
module: Carry out the following steps:

1. Exhaust the HMP−... linear module and

remove if required.

2. Remove the cover caps (A) on the HMP−...

and the housing cover (B).

3. Move the guide tube of the HMP−... by

hand into the extended end position.

4. Unscrew the screws (C) in the front cover

and push the front cover approx. 10 mm in
the direction of the front plate in order to
insert the clamping unit.

5. Press the manual override and at the

same time insert the clamping rod into the
pre−mounted clamping unit until about
5Ămm of the thread project out.

The following points must be observed
here:

ć Compressed air connection

6 must lie

on the opposite side of fastening
flange (X).

ć When pressing the manual override,

hold your forefinger against the oppoĆ
site side as shown in Bild 7.

6. Insert trunnion (Z) of the clamping unit

into the bore on the front cover of the
HMP base profile and screw in the fastenĆ
ing screw from outside through the front
cover into threaded bore (D) of the clampĆ
ing unit. The tightening torque is 5.9 Nm.

Fig. 5

(A)

(B)

У

У

У

У

Fig. 6

(C)

Fig. 7

6

(X)

Fig. 8

(Z)

(D)

Advertising
This manual is related to the following products: