Lenovo Secure Managed Client User Manual

Page 81

Advertising
background image

15.

Disconnect

the

following

cables:

v

P12V4

cable

1

v

Main

power

cable

2

v

Auxiliary

power

signal

cable

3

v

IPBM

cable

5

v

(Disregard

if

using

a

USB

DOM)

USB

header

6

v

All

SAS

and/or

SATA

cables

7

thru

12

v

Front

control

panel

cables

13

and

14

v

Serial

B/emergency

management

port

cable

15

16.

16.

Remove

standoff

4 .

Power

Reset

1

P12V4

cable

connector

9

SATA

2

or

SAS

0

cable

connector

2

Main

power

cable

connector

10

SATA

3

or

SAS

1

cable

connector

3

Auxiliary

power

signal

cable

connector

11

SATA

4

or

SAS

2

cable

connector

4

Standoff

12

SAS

or

SATA

cable

connector

5

IPBM

cable

connector

13

Front

control

panel

cable

connector

6

USB

cable

connector

14

Front

control

panel

cable

connector

7

SATA

0

cable

connector

15

Serial

B/emergency

management

port

cable

connector

8

SATA

1

cable

connector

17.

Remove

the

seven

screws

securing

the

server

board

to

the

chassis.

Remove

server

board

from

chassis

and

place

in

an

anti-static

bag.

18.

Install

the

new

server

board

by

aligning

the

screw

holes

in

the

server

board

with

the

standoffs

in

the

chassis.

19.

Install

the

processor(s)

and

heatsink(s).

For

instructions,

see

“Installing

the

Processor”

on

page

49.

Chapter

8.

Features

75

Advertising