General maintenance, Gauge label replacement - model 25 pd (continued) – Fluid Management 53PD Blendorama User Manual User Manual

Page 30

Advertising
background image

28 | Blendorama Dispenser

Fluid Management Customer Service 1 . 800 . 462 . 2466

f. Carefully place the “0” line (the line below the

numeral) of the label on the marked line of the

gauge.

g. Once in position, press the label firmly onto the

gauge, ensuring it adheres to the gauge along

its full length with no creases or bubbles (use a

clean cloth to apply if necessary).

h. Using a sharp knife or blade cut any excess

label off the end of the gauge that may overlap

the black plastic handle.

i. Refit the gauge to the plunger. Repeat steps (d)

through (h) for the inner (red) gauge label.

General Maintenance

Gauge label replacement - Model 25 PD (continued)

Advertising
This manual is related to the following products: