General maintenance, Gauge label replacement - model 53 pd (continued) – Fluid Management 53PD Blendorama User Manual User Manual

Page 33

Advertising
background image

Fluid Management Customer Service 1 . 800 . 462 . 2466

Blendorama Dispenser | 31

j. Align the end of the label up against the bottom

edge of the gauge knob (the label is cut to size

before leaving the factory).

k. Once in position, press the label firmly onto the

gauge, ensuring it adheres to the gauge along

its full length with no creases or bubbles (use a

clean cloth to apply if necessary).

l. Refit the red gauge to the plunger.

General Maintenance

Gauge label replacement - Model 53 PD (continued)

Advertising
This manual is related to the following products: