General maintenance, Gauge label replacement - model 53 pd – Fluid Management 53PD Blendorama User Manual User Manual

Page 31

Advertising
background image

Fluid Management Customer Service 1 . 800 . 462 . 2466

Blendorama Dispenser | 29

Before replacing the labels, calibrate the plungers as per the calibration instructions. Also make sure that the

replacement label is the correct one - check the part numbers.

a. Remove both black and red gauges.

b. Peel the labels off both the red and black

gauges. Remove all traces of adhesive (use a

solvent if necessary). Wipe dry.

c. Replace both gauges and set to the fully down

position. Lift the black (outer) gauge and engage

the locking pin in the 2nd hole from the top.

d. Mark a line on the black gauge, level with the top

of the red handle. Use a fine felt tip pen or pencil

(or scratch with a sharp object), then remove the

black gauge from the pump.

General Maintenance

Gauge label replacement - Model 53 PD

Advertising
This manual is related to the following products: